The Ram- and injection head is used in conjunction with the G¼" ram injection lance in slightly sandy soils for the purpose of sealing or consolidation. An enormous advantage of the Ram- and injection head is the possibility of flushing in during the ram injection process. In this way, the exit holes do not become clogged with the fine sand.
Work process
Connect ram lance with ram and injection head
Mount Geka coupling
Position the ram lance
Connect water until it emerges from transverse holes
Drive ram lance to desired depth (depths up to 3 m)
Connect the injection connection to material delivery line
Inject
After the injection process, pull the ram lance with ram and injection head out of the ground and clean it. For short lengths, it is possible to pull the ram injection lances manually by the handle.
Добавить элемент в корзину покупок
Добавить все выбранные товары в корзину покупок
Удалить элемент из корзины
Список рассылки
Список рассылки
Позиции нет на складе Поставка возможна.
Товар в наличии низкий количество на складе
Артикул в достаточном количестве количество на складе
Статья во входе
Статья включена в продолжающуюся акцию
вверх по адресу
ВОЙДИТЕ В ПОРТАЛ ДИЛЕРА
Войдите на портал дилеров DESOI с вашими данными доступа. Используйте свой адрес электронной почты и пароль для этого.